Concrete field guide · Approval & Closeout

How should the concrete scope be approved and closed?

Use one area map, written change points, finish review, reopening direction and a clear remaining-items list.

A useful bid comparison begins before the totals. Every bidder needs the same areas, use requirements, access facts, acceptance criteria, and treatment of unknown conditions.

Issue one scope basis

Provide a location map, safe photos, known history, intended use, access constraints, required operating paths, and existing reports. Label unverified information clearly.

Normalize the options

Compare repair, partial replacement, and broader replacement by removal, base work, joints, edges, finish, protection, curing, and exclusions rather than title alone.

Approve phases and changes

Assign a decision-maker and response method for concealed conditions, added areas, access conflicts, sample review, and return-to-use direction. Preserve the final selection in closeout records.

Publish facts and unknowns to every bidder

Facts can include a numbered location plan, property operating hours, prior repair records, known utility markings, observed ponding, and management criteria. Unknowns may include base, reinforcement, cause of damage, hidden utility conflicts, and final quantities after removal. One shared list reduces proposals that look comparable but rely on different assumptions.

Compare options on operating impact

Repair can limit immediate work zones but may create more separate visits or transitions. Partial replacement can consolidate selected areas while retaining others. Broader replacement may create a more continuous new surface but requires larger closures, material movement, curing protection, and budget. Compare the number and duration of phases, protected paths, communications, and reopenings beside physical inclusions.

Illustrative scope example

Illustrative only: a manager might issue Area A as a localized repair alternate and Areas A through C as a panel-replacement alternate. Each would use the same map and state demolition, base assumptions, joints, finish, protection, cure restriction, exclusions, and unit or written approval method for added area. Field findings would control the actual recommendation.

Prepare an approval packet

Collect the marked plan, safe photos, complaint or incident history, earlier scopes, access rules, insurance or vendor requirements, operating schedule, and names of the property and field decision-makers. Identify which document controls if association, owner, and manager criteria differ. Request one exclusions list and one change process from every bidder.

Questions every alternate should answer

Does the alternate use the same marked locations and quantities? What condition is it intended to address, and what does it leave unresolved? Are demolition, base preparation, reinforcement, joints, finish, protection, phasing, curing, and cleanup described consistently? What unit, allowance, or written change method applies to added areas? Who accepts samples, directs occupant notices, authorizes reopening, and receives the final record? Missing answers make total-price comparison unreliable.

Keep the assembly decision property-specific

Ask the proposal to separate verified site conditions from base, reinforcement, edge and joint assumptions. When demolition exposes a different condition, photograph it, explain how it changes the planned work, and obtain the applicable direction before covering it. This keeps the customer involved without asking them to design the concrete assembly.

Leave one clear final status

Give the customer a dated list of completed areas, approved changes, finish review, curing protection, reopening direction, punch work, exclusions and recommendations. Attach useful stage photos and identify who owns each remaining item. A fresh-placement photo documents a stage; it does not replace the project-specific reopening instruction or final walk.

Concrete Approval and Closeout

Use a blank copy for the actual request. Do not enter access codes or unnecessary personal details.

Area/phase
________________
Approved option
________________
Change
________________
Completed work
________________
Finish review
________________
Cure protection
________________
Reopening direction
________________
Punch
________________
Remaining item
________________
Recipient/date
________________
Download blank CSV ↓

Before approval

  • Common marked-area plan
  • Known history and reports
  • Comparable inclusions and exclusions
  • Required access paths
  • Phase sequence
  • Change authority and closeout record

Resolve before the next stage

Common decision questions

Can photos determine the concrete repair?+

No. They help prepare a field review and define questions.

Should drainage or movement causes be assumed?+

No. Record observations and keep the cause open until supported.

What makes a proposal comparable?+

Clear removal, retained work, base assumptions, edges, joints, finish, protection, curing and exclusions.